| Milestone | Date |
|---|---|
| RFP Issue Date | October 1, 2026 |
| Final Date for Question Submittal | October 15, 2026 |
| Proposal Submission Deadline (5:00 p.m. CDT) | October 23, 2026 |
| Notification of Shortlisted Proposals | December 4, 2026 |
| Due Date for Phase 2 Proposals (5:00 p.m. CST) | January 8, 2027 |
| Notification of Final Results | February 18, 2027 |
| Negotiation and Execution of Final Contract | Q1 to Q2, 2027 |
Relevant questions and responses related to the United Cooperative Services 2026 Request for Proposals for ERCOT Power Supply Resources will be posted on this page.
Yes, as long as they are relevant to the RFP.
Responses to questions will be provided as soon as practical. Response times will vary depending upon the complexity of the question.
Yes. United will consider demand-side and behind-the-meter aggregation proposals.
Yes. While delivery to the ERCOT North Load Zone is preferred, followed by the ERCOT North Hub, United will consider proposals at other ERCOT delivery points, including nodal delivery. Please clearly identify the proposed delivery point and any associated basis or delivery considerations.
United has not specified a load ramp schedule for purposes of this RFP. Respondents may propose alternative commencement dates and delivery profiles for consideration.
United’s legal entity name is United Electric Cooperative Services, Inc. dba United Cooperative Services.
Yes. Distribution-connected resources, including DGRs and DESRs, may be submitted for consideration. For Appendix A Items 33, 52, and 55, please provide the applicable distribution interconnection information in the Notes field or an attachment, and indicate N/A where a transmission-specific field does not apply.
Respondents proposing distribution-connected resources should identify their proposed interconnection locations, status, and any expected studies or timelines. Any applicable distribution interconnection process, study requirements, or preferred locations would be addressed separately by United.
Yes. Respondents may propose a fleet or aggregation of smaller resources at multiple locations as a single offer. The RFP does not specify a minimum individual resource size or offer size. Please provide resource-level information, including location, capacity, and dispatch rights, along with the aggregate offer details.
Please quote storage capacity charges on the basis of guaranteed available discharge capacity, expressed in $/kW-month, and clearly identify the corresponding nameplate capacity, discharge duration, and performance assumptions. Alternative pricing structures may also be included for consideration.
United has not established a specific minimum discharge duration for storage proposals in the RFP. Please specify the proposed duration, guaranteed discharge capacity, operating limitations, and other characteristics relevant to dependable capacity. United will evaluate these attributes as part of its overall proposal review.
The RFP does not require collateral posting at bid submission. Any applicable collateral or credit support requirements would be addressed during subsequent commercial and contractual discussions.
Yes. United will consider a proposal for an operating 200 MW BESS project at the ERCOT North Hub.
Yes. United will consider standalone battery storage proposals, as well as other resource types. United has a preference for dependable, dispatchable capacity backed by physical generating resources or fleets, with dispatch rights. Proposals will be evaluated based on their overall ability to meet United’s needs.
Yes. United will consider an operational standalone BESS project located in ERCOT South. ERCOT North Load Zone delivery is preferred, followed by North Hub, but other ERCOT delivery locations will also be considered.
United will consider standalone BESS proposals and does not require storage to be paired with a separate generating resource for a proposal to be submitted. However, United has a preference for dependable, dispatchable capacity backed by physical generation.